Ajakava, ferry lines (window)
Last updated: 09.01.2023
In this article
Register > Parvlaevad > Ajakava
Timetables for ferry lines can be configured in this window.
National public holidays must be defined in Register > Pühad. They are not automatically retrieved from the calendar.
Juhtub
Select the interval to base the schedule on.
Select Igapäevane if the scheduled event should occur on specific days, for example every day, or every Sunday and public holiday.
|
Function |
Description |
|---|---|
|
Intervall |
Frequency of repetition:
If you enter “0”, the scheduled event does not take place. |
|
Nädalapäev |
The scheduled event occurs only on weekdays, Monday to Friday. |
|
Laupäeviti ja päev enne püha |
The scheduled event occurs only on Saturdays and days prior to national public holidays. |
|
Pühapäevad ja pühad |
The scheduled event occurs only on Sundays and national public holidays. |
Example:
If the interval “3” and Nädalapäev are selected, but Laupäeviti ja päev enne püha and Pühapäevad ja pühadare not selected, Opter will select every third day if it is a weekday.
-
If the third day falls on a weekday, the scheduled event will take place.
-
If the third day falls on a Saturday, a day before a public holiday, a Sunday or a public holiday, the scheduled event will not take place.
Select Igakuine if the scheduled event should occur on certain days in the month, for example the 15th or every Sunday and public holiday.
|
Function |
Description |
|---|---|
|
Päevad kuus |
The date during the month on which the event should occur. Separate multiple dates with spaces, commas (with or without spaces after them) or semicolons (with or without spaces after them), (e.g. “1 5 10”, “1, 5, 10” or “1;5;10”. If the field is left blank, the scheduled event will occur on every day of the month defined by the setting for Nädalapäev, Laupäeviti ja päev enne püha and Pühapäevad ja pühad. The dates are not saved in this field. The next time the Schedule window is opened, it will be empty. The dates can be seen at the bottom of Next three occasions. |
|
Intervall |
Frequency of repetition:
If you enter “0”, the scheduled event does not take place. |
|
Nädalapäev |
The scheduled event occurs only on weekdays, Monday to Friday. |
|
Laupäeviti ja päev enne püha |
The scheduled event occurs only on Saturdays and days prior to national public holidays. |
|
Pühapäevad ja pühad |
The scheduled event occurs only on Sundays and national public holidays. |
Example:
If the dates “5, 15, 25” and interval “1” are specified and Nädalapäev is selected, but not Laupäeviti ja päev enne püha and Pühapäevad ja pühad, Opter will check every month whether the 5th, 15th and 25th are weekdays.
-
If the dates fall on a weekday, the scheduled event will take place.
-
If the dates fall on a Saturday, a day before a public holiday, a Sunday or a public holiday, the scheduled event will not take place.
Select Iganädalane if the scheduled event should occur on certain days of the week, e.g. every Tuesday and Friday, or every other Wednesday..
|
Function |
Description |
|---|---|
|
esmaspäev–pühapäev |
Weekdays. These checkboxes must be selected together with the checkboxes below. If esmaspäev-reede are selected, Nädalapäev must be selected, otherwise the scheduled event will not occur. The reverse is also true. If pühapäev is not selected but Pühapäevad ja pühad is selected, the scheduled event will not take place on Sundays. |
|
Intervall |
Frequency of repetition:
If you enter “0”, the scheduled event does not take place. |
|
Nädalapäev |
The scheduled event occurs only on weekdays, Monday to Friday. |
|
Laupäeviti ja päev enne püha |
The scheduled event occurs only on Saturdays and days prior to national public holidays. |
|
Pühapäevad ja pühad |
The scheduled event occurs only on Sundays and national public holidays. |
Example:
If reede and the interval “2” are specified, and Nädalapäev and Laupäeviti ja päev enne püha, but not Pühapäevad ja pühad are selected, Opter will check every other week whether Friday is a weekday.
-
If the Friday falls on a weekday, the scheduled event will take place.
-
If the Friday falls on a public holiday, the scheduled event will not take place.
Select Instance if you want the scheduled event to occur on a specific day of the month, for example the first day of every month, or the third Friday of every other month. The scheduled event occurs no more than once a month. To ensure that it occurs several times a month, select Igakuine under Juhtub.
|
Function |
Description |
|---|---|
|
First drop-down list |
The time of day in the month at which the scheduled event should occur. |
|
Second drop-down list |
The day in the month on which the scheduled event should occur. |
|
Third drop-down list |
Frequency of repetition:
If you enter “0”, the scheduled event does not take place. |
Periood
Specify the dates between which the schedule will apply. Opter assumes the Alates date when calculating the schedule interval.
Paus
To pause the schedule, specify the dates between which the pause will apply. The scheduled event does not take place between the dates you specify. You can specify several date ranges, for example, if you want to have a pause throughout July, and one between 24 December and 8 January.
Next three occasions
This shows the three closest dates when the scheduled event will occur. Please check that it is correct.
Example
Since departure and arrival times are indicated in the ferry registry rather than in the schedule, the same times apply to all days set in the schedule. If the ferry departs or arrives at different times on weekdays and Saturdays for example, two ferry lines must be created, one for weekdays and one for Saturdays, with different departure and arrival times, and different schedules.
-
Juhtub: Igapäevane
-
Intervall: 1
-
Nädalapäev:

-
Laupäeviti ja päev enne püha:

-
Pühapäevad ja pühad:

-
Juhtub: Igakuine
-
Intervall: 1
-
Päevad kuus: “10, 20”
-
Nädalapäev:

-
Laupäeviti ja päev enne püha:

-
Pühapäevad ja pühad:

-
Juhtub: Iganädalane
-
esmaspäev and Neljapäev:

-
Other days of the week:

-
Intervall: 1
-
Nädalapäev:

-
Laupäeviti ja päev enne püha:

-
Pühapäevad ja pühad:

-
Create two identical ferry lines but with different departure times in the Parvlaevad window.
-
On the ferry line running Monday-Saturday and departing at 9:25, set the schedule as follows:
-
Juhtub: Igapäevane
-
Intervall: 1
-
Nädalapäev:

-
Laupäeviti ja päev enne püha:

-
Pühapäevad ja pühad:

-
-
On the ferry line running on Sundays and public holidays and departing at 13:00, set the schedule as follows:
-
Juhtub: Igapäevane
-
Intervall: 1
-
Nädalapäev:

-
Laupäeviti ja päev enne püha:

-
Pühapäevad ja pühad:

-
For more examples of schedules, see Creating schedule templates, (this article relates to scheduled orders, but also applies to ferry lines).
See also
-
Creating schedule templates (examples of timetables)